15/09/2006
HITONE® operation at Chiba Prefecture was successfully done.
The Hot In-place Transforming work by the HITONE® system was successfully
done as the experimental construction of Chiba Prefecture.
There were about 70 visitors included foreign visitors.
| Date | September15,16 and 20,2006 |
|---|---|
| Place | National Rout126 at Iioka, Chiba Prefecture |
| Road Length | 840‚ |
| Construction Area | 3,000‡u |














